Availability: | In stock in Olsene |
Delivery Information
- Click here for all information regarding home delivery and delivery times.
- Click here for all information regarding pickup in Olsene (East Flanders, Belgium).
Product Information
Next to each black adjustment screw, up to four frame screws can be fixed into the subfloor.
Wooden subfloor: pre-drilling is not necessary. Place one frame screw per 1 m² for additional stability. Screw in the frame screw in two steps to prevent the CircoFloor system from being pushed up during installation.
Concrete subfloor: first drill a Ø 6 mm hole through the existing hole in the structural plate, then screw in the frame screw. Always insert at least a few frame screws to secure the system.
Do not overtighten the screw; once it is anchored in the subfloor, the system is secured. Thanks to the threading in the structural plate, the screw does not need to be fully driven in; once it grips the subfloor, the system is held in place.
Multilayer parquet can be glued onto OSB 3/4 boards, provided the CircoFloor system is anchored to the subfloor with at least four frame screws per m² and the OSB 3/4 boards are fastened to the CircoFloor system with at least 13 wood screws per m².